Home
SwitchTool
About us
Insights
Resources
Global
China
1183.5
GW
5285
MT
Coal plants in
China
Additional profit over 30 years
2826.7
Bn. $
% Profitable
98
%
Annual CO2 emissions saved
5285
MT / year
Total W-S-B investment need
2671.0
Bn. $
Investment Potential
42
n.a.
%
of this country’s annual energy-related CO2 emissions could be eliminated by SwitchCoal.
Investment breakdown
2671.0
Bn. $
Initial Investment for Conversion to Wind and Solar Power Plant
2826.7
Bn. $
Additional profit from switch over 30 years (Source: IEA World Energy Outlook 2022)
Solar
1,722,155
M. $
Wind
913,395
M. $
Battery
125,772
M. $
Production costs
5.5
ct/kWh
Mean OPEX of the coal plants within this country (Source: IEA World Energy Outlook 2022)
3.7
ct/kWh
Production cost of renewable energy
Dive deeper into the data
0
Regions
0
Power plants
Sort by
CO2 emissions saved (high-low)
CO2 emissions saved (low-high)
Total W-S-B inv. need (high-low)
Total W-S-B inv. need (low-high)
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Region
CO2 emissions saved
Total W-S-B inv. need
% Profitable plants
Inner Mongolia
CO2 emissions saved
536.5
MT/y
Total W-S-B inv. need
210.2
Bn. $
% Profitable plants
100
%
Shandong
CO2 emissions saved
509.6
MT/y
Total W-S-B inv. need
256.9
Bn. $
% Profitable plants
100
%
Jiangsu
CO2 emissions saved
365.4
MT/y
Total W-S-B inv. need
187.9
Bn. $
% Profitable plants
100
%
Guangdong
CO2 emissions saved
359.8
MT/y
Total W-S-B inv. need
192.2
Bn. $
% Profitable plants
100
%
Shanxi
CO2 emissions saved
342.3
MT/y
Total W-S-B inv. need
170.2
Bn. $
% Profitable plants
100
%
Henan
CO2 emissions saved
301.0
MT/y
Total W-S-B inv. need
166.3
Bn. $
% Profitable plants
100
%
Xinjiang
CO2 emissions saved
289.7
MT/y
Total W-S-B inv. need
135.2
Bn. $
% Profitable plants
98
%
Anhui
CO2 emissions saved
245.2
MT/y
Total W-S-B inv. need
131.6
Bn. $
% Profitable plants
100
%
Shaanxi
CO2 emissions saved
234.5
MT/y
Total W-S-B inv. need
118.6
Bn. $
% Profitable plants
100
%
Hebei
CO2 emissions saved
232.7
MT/y
Total W-S-B inv. need
123.4
Bn. $
% Profitable plants
100
%
Zhejiang
CO2 emissions saved
213.8
MT/y
Total W-S-B inv. need
125.6
Bn. $
% Profitable plants
100
%
Guizhou
CO2 emissions saved
163.7
MT/y
Total W-S-B inv. need
95.9
Bn. $
% Profitable plants
97
%
Hubei
CO2 emissions saved
154.9
MT/y
Total W-S-B inv. need
89.7
Bn. $
% Profitable plants
100
%
Liaoning
CO2 emissions saved
154.7
MT/y
Total W-S-B inv. need
71.8
Bn. $
% Profitable plants
100
%
Ningxia
CO2 emissions saved
135.3
MT/y
Total W-S-B inv. need
59.1
Bn. $
% Profitable plants
100
%
Fujian
CO2 emissions saved
131.6
MT/y
Total W-S-B inv. need
72.1
Bn. $
% Profitable plants
100
%
Hunan
CO2 emissions saved
128.3
MT/y
Total W-S-B inv. need
67.9
Bn. $
% Profitable plants
100
%
Gansu
CO2 emissions saved
124.3
MT/y
Total W-S-B inv. need
57.5
Bn. $
% Profitable plants
100
%
Jiangxi
CO2 emissions saved
119.1
MT/y
Total W-S-B inv. need
66.5
Bn. $
% Profitable plants
100
%
Guangxi
CO2 emissions saved
114.5
MT/y
Total W-S-B inv. need
56.9
Bn. $
% Profitable plants
92
%
Heilongjiang
CO2 emissions saved
97.3
MT/y
Total W-S-B inv. need
43.0
Bn. $
% Profitable plants
100
%
Jilin
CO2 emissions saved
81.1
MT/y
Total W-S-B inv. need
34.6
Bn. $
% Profitable plants
100
%
Shanghai
CO2 emissions saved
70.7
MT/y
Total W-S-B inv. need
37.9
Bn. $
% Profitable plants
86
%
Tianjin
CO2 emissions saved
56.3
MT/y
Total W-S-B inv. need
29.1
Bn. $
% Profitable plants
100
%
Yunnan
CO2 emissions saved
48.8
MT/y
Total W-S-B inv. need
28.2
Bn. $
% Profitable plants
91
%
Chongqing
CO2 emissions saved
32.5
MT/y
Total W-S-B inv. need
22.0
Bn. $
% Profitable plants
58
%
Hainan
CO2 emissions saved
14.6
MT/y
Total W-S-B inv. need
6.9
Bn. $
% Profitable plants
100
%
Qinghai
CO2 emissions saved
14.0
MT/y
Total W-S-B inv. need
6.0
Bn. $
% Profitable plants
100
%
Sichuan
CO2 emissions saved
9.3
MT/y
Total W-S-B inv. need
6.0
Bn. $
% Profitable plants
15
%
Load more
Sort by
CO2 emissions (high-low)
CO2 emissions (low-high)
Investment need (high-low)
Investment need (low-high)
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Plant
CO2 emissions
Investment need
Profitable?
CNSG Jilantai Salt captive power station
CO2 emissions
1.4
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Dalian Taishan power station
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Duolun Coal Chemical power station
CO2 emissions
1.4
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Great Waste Coal power station
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Hebi Coal Mine power station
CO2 emissions
1.4
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Henan Aluminum power station
CO2 emissions
1.4
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Hexigten Coal Gasification captive power station
CO2 emissions
1.4
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Heze Zhaolou power station
CO2 emissions
1.4
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Huawei Hetian power station
CO2 emissions
1.4
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Huineng power station
CO2 emissions
1.4
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Ili Nangang Cogen power station
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Jiagedaqi Cogen power station
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Jinchuan power station
CO2 emissions
1.4
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Jingling Sinopec power station
CO2 emissions
1.4
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Kaidi Languang power station
CO2 emissions
1.4
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Kuitun Jinjiang power station
CO2 emissions
1.4
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Longchuan power station
CO2 emissions
1.4
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Luoding power station
CO2 emissions
1.4
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Ningbo Boxboard Mill power station
CO2 emissions
1.4
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Pansan power station
CO2 emissions
1.4
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Pingdingshan Ruiping power station
CO2 emissions
1.4
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Qiaotou power station
CO2 emissions
1.4
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Ronghai power station
CO2 emissions
1.4
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Shandong Huatai power station
CO2 emissions
1.4
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Shandong Yankuang Jisan power station
CO2 emissions
1.4
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Suiyang power station
CO2 emissions
1.4
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Xihai-2 power station
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Xiwu Jinshan power station
CO2 emissions
1.4
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Yixing Xielian power station
CO2 emissions
1.4
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Yulin Shanghe power station
CO2 emissions
1.4
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Lee & Man Paper power station
CO2 emissions
1.3
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Baitao cogen power station
CO2 emissions
1.2
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Baotou Works power station
CO2 emissions
1.2
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Daqing Oil Hongwei power station
CO2 emissions
1.2
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
GreenGen power station
CO2 emissions
1.2
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Heilongjiang Hegang Mining power station
CO2 emissions
1.2
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Liaoyang Chemical power station
CO2 emissions
1.2
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Luxi Chemical cogen power station
CO2 emissions
1.2
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Qian an Cogen power station
CO2 emissions
1.2
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Shandong Haihua Weifang power station
CO2 emissions
1.2
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Sinopec Anqing power station
CO2 emissions
1.2
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Sinopec Yangzi power station
CO2 emissions
1.2
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Wuhan Ethylene power station
CO2 emissions
1.2
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Xiahuayuan power station
CO2 emissions
1.2
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Yangjiachang Town Cogen power station
CO2 emissions
1.2
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Zhangjiagang Shagang power station
CO2 emissions
1.2
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Huanggang Paper Mill Cogen Power Station
CO2 emissions
1.2
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Asia Symbol captive power station
CO2 emissions
1.1
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Chongqing Nine Dragons Cogen power station
CO2 emissions
1.1
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
APP Jinhuasheng Mill power station
CO2 emissions
1.0
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Dongming Plastic power station
CO2 emissions
1.0
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Dongyuan Tech power station
CO2 emissions
1.0
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Guangzhou Refinery power station
CO2 emissions
1.0
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Huayi Jinlong Cogen power station
CO2 emissions
1.0
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Maoming Refinery power station
CO2 emissions
1.0
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Mudanjiang Cogen power station
CO2 emissions
1.0
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Ordos Shendong power station
CO2 emissions
1.0
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Tangshan Sanyou Cogen power station
CO2 emissions
1.0
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Yulin Coal Liquefaction power station
CO2 emissions
1.0
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Yulin Chemical power station
CO2 emissions
1.0
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Zhangdian power station
CO2 emissions
1.0
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Zhoushan Petrochemical Base Cogen power station
CO2 emissions
1.0
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Jinyufeng Biotechnology Co Kailu Cogen power station
CO2 emissions
1.0
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Chengfeng Cogen power station
CO2 emissions
0.9
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Dongying Huatai Chemical power station
CO2 emissions
0.9
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
East Hailar power station
CO2 emissions
0.9
MT/y
Investment need
0.3
Bn. $
Profitable?
Yes
No
Haifengherui power station
CO2 emissions
0.9
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Hengtong Chemical Power Station
CO2 emissions
0.9
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Huaneng Songyuan Cogen power station
CO2 emissions
0.9
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Hubei Xingfu power station
CO2 emissions
0.9
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Jinyuankou Cogen power station
CO2 emissions
0.9
MT/y
Investment need
0.3
Bn. $
Profitable?
Yes
No
Ningxia Meili power station
CO2 emissions
0.9
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Shandong Hualu Hengsheng power station
CO2 emissions
0.9
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Sinopec Luoyang Branch power station
CO2 emissions
0.9
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Weihai Chucun cogen power station
CO2 emissions
0.9
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Wudi Zhongcheng Sanyue cogen power station
CO2 emissions
0.9
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Xishan Cogen power station
CO2 emissions
0.9
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Zibo Hongda power station
CO2 emissions
0.9
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Benxi Steel & Iron power station
CO2 emissions
0.8
MT/y
Investment need
0.3
Bn. $
Profitable?
Yes
No
Chongqing Lee & Man Paper power station
CO2 emissions
0.8
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Chongqing Wanzhou Cogen power station
CO2 emissions
0.8
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Fuyang Haoyuan cogen power station
CO2 emissions
0.8
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Ili Xintian Chemical power station
CO2 emissions
0.8
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Jiangsu Leeman Paper power station
CO2 emissions
0.8
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Jinjiang power station
CO2 emissions
0.8
MT/y
Investment need
0.3
Bn. $
Profitable?
Yes
No
Jiyang Xinhua Energy Ltd power station
CO2 emissions
0.8
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Lianyuan Cogen power station
CO2 emissions
0.8
MT/y
Investment need
0.3
Bn. $
Profitable?
Yes
No
Sateri Jiangxi Chemical Fiber Co captive power station
CO2 emissions
0.8
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Shaanmei Group Yulin Chemical captive power station
CO2 emissions
0.8
MT/y
Investment need
0.3
Bn. $
Profitable?
Yes
No
Fujian Putian Shimen ao Cogen power station
CO2 emissions
0.8
MT/y
Investment need
0.3
Bn. $
Profitable?
Yes
No
Jianli Bailuo cogen power station
CO2 emissions
0.8
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Zhangpu Chihu Industrial Park Cogen power station
CO2 emissions
0.8
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Zhongying Paper Mill cogen power station
CO2 emissions
0.8
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Anshan Steel Company No 2 power station
CO2 emissions
0.7
MT/y
Investment need
0.3
Bn. $
Profitable?
Yes
No
Singpu Chemicals Taixing power station
CO2 emissions
0.7
MT/y
Investment need
0.3
Bn. $
Profitable?
Yes
No
Yangmei-3 power station
CO2 emissions
0.7
MT/y
Investment need
0.3
Bn. $
Profitable?
Yes
No
Yishui County cogen power station
CO2 emissions
0.7
MT/y
Investment need
0.3
Bn. $
Profitable?
Yes
No
Aoweiqianyuan Captive power station
CO2 emissions
0.6
MT/y
Investment need
0.3
Bn. $
Profitable?
Yes
No
Baitao Industrial Park Heat Island Center power station
CO2 emissions
0.6
MT/y
Investment need
0.4
Bn. $
Profitable?
Yes
No
Baotou Sanfeng power station
CO2 emissions
0.6
MT/y
Investment need
0.2
Bn. $
Profitable?
Yes
No
Previous
Next
Load more
Location view
Get insights for a country or region
Country
Region
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Zimbabwe
Zambia
Vietnam
Uzbekistan
United States
Ukraine
United Kingdom
Türkiye
Thailand
Tajikistan
Taiwan
Sri Lanka
Spain
South Korea
South Africa
Slovenia
Slovakia
Serbia
Senegal
Russia
Romania
Panama
Poland
Philippines
Pakistan
North Macedonia
North Korea
Nigeria
New Zealand
Netherlands
Namibia
Myanmar
Morocco
Montenegro
Mexico
Mongolia
Mauritius
Malaysia
Madagascar
Kyrgyzstan
Laos
Kosovo
Kazakhstan
Japan
Italy
Israel
Ireland
Iran
Indonesia
India
Hungary
Hong Kong
Guatemala
Honduras
Guadeloupe
Greece
Germany
France
Finland
Brunei
Dominican Republic
Denmark
Colombia
Czech Republic
Croatia
China
Chile
Cambodia
Canada
Bulgaria
Brazil
Bosnia and Herzegovina
Botswana
Australia
Argentina
Bangladesh
Cannot find a country? This means it was not analyzed as part of the SwitchCoal study.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Mon
Miyagi
Montana
Missouri
Minnesota
Mississippi
Michigan
Midtjylland
Miaoli
Mecklenburg-Vorpommern
Mazowieckie
Matabeleland North
Maranhão
Manisa
Maryland
Maluku
Małopolskie
Madhya Pradesh
Mallorca
Maharashtra
Lviv
Lubuskie
Luhansk
Lubelskie
Louisiana
Lower Saxony
Loire-Atlantique
Ljubljana
Lodzkie
Limpopo
Lang Son
Liaoning
Lampung
Kyustendil
Lampang
Lam Dong
Kyūshū
Kyiv
KwaZulu-Natal
Kujawsko-Pomorskie
Kütahya
Královéhradecký
Krasnoyarsk
Kostanay
Konya
Košice
Kosovo
Kogi
Kirov
Kocaeli
Kicevo
Khulna
Kharkiv
Khomas
Khorasan
Khanh Hoa
Khakassia
Khabarovsk
Kentucky
Kemerovo
Kayin
Karnataka
Karlovarský
Karaganda
Kaohsiung
Kantō
Kansas
Kanchanaburi
Kansai
Johor
Kahramanmaraş
Kaliningrad
Jilin
Jihomoravský
Jiangxi
Jiangsu
Jharkhand
Jambi
İzmir
Ivano-Frankivsk
Istra
Irkutsk
Iowa
Indiana
Inner Mongolia
Incheon
Illinois
Ilocos
Hunan
Iaşi
Hubei
Hunedoara
Hualien
Hong Kong
Hokkaido
Hessen
Heilongjiang
Henan
Hamburg
Hau Giang
Previous
Next
Cannot find a region? This means it was not analyzed as part of the SwitchCoal study.
Load more