12.7
 GW
55
 MT

Coal plants in

Malaysia

Additional profit over 30 years
35.1
Bn. $
% Profitable
88
%
 
Annual CO2 emissions saved
55
MT / year
Total W-S-B investment need
32.0
Bn. $

Investment Potential

22
n.a.
%
of this country’s annual energy-related CO2 emissions could be eliminated by SwitchCoal.

Investment breakdown

32.0
Bn. $
Initial Investment for Conversion to Wind and Solar Power Plant
35.1
Bn. $
Additional profit from switch over 30 years (Source: IEA World Energy Outlook 2022)
Solar
30,786
M. $
Wind
0
M. $
Battery
2,700
M. $

Production costs

5.2
ct/kWh
Mean OPEX of the coal plants within this country (Source: IEA World Energy Outlook 2022)
3.6
ct/kWh
Production cost of renewable energy

Dive deeper into the data

Get insights for a country or region