Home
SwitchTool
About us
Insights
Resources
Global
China
1183.5
GW
5285
MT
Coal plants in
China
Additional profit over 30 years
2826.7
Bn. $
% Profitable
98
%
Annual CO2 emissions saved
5285
MT / year
Total W-S-B investment need
2671.0
Bn. $
Investment Potential
42
n.a.
%
of this country’s annual energy-related CO2 emissions could be eliminated by SwitchCoal.
Investment breakdown
2671.0
Bn. $
Initial Investment for Conversion to Wind and Solar Power Plant
2826.7
Bn. $
Additional profit from switch over 30 years (Source: IEA World Energy Outlook 2022)
Solar
1,722,155
M. $
Wind
913,395
M. $
Battery
125,772
M. $
Production costs
5.5
ct/kWh
Mean OPEX of the coal plants within this country (Source: IEA World Energy Outlook 2022)
3.7
ct/kWh
Production cost of renewable energy
Dive deeper into the data
0
Regions
0
Power plants
Sort by
CO2 emissions saved (high-low)
CO2 emissions saved (low-high)
Total W-S-B inv. need (high-low)
Total W-S-B inv. need (low-high)
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Region
CO2 emissions saved
Total W-S-B inv. need
% Profitable plants
Inner Mongolia
CO2 emissions saved
536.5
MT/y
Total W-S-B inv. need
210.2
Bn. $
% Profitable plants
100
%
Shandong
CO2 emissions saved
509.6
MT/y
Total W-S-B inv. need
256.9
Bn. $
% Profitable plants
100
%
Jiangsu
CO2 emissions saved
365.4
MT/y
Total W-S-B inv. need
187.9
Bn. $
% Profitable plants
100
%
Guangdong
CO2 emissions saved
359.8
MT/y
Total W-S-B inv. need
192.2
Bn. $
% Profitable plants
100
%
Shanxi
CO2 emissions saved
342.3
MT/y
Total W-S-B inv. need
170.2
Bn. $
% Profitable plants
100
%
Henan
CO2 emissions saved
301.0
MT/y
Total W-S-B inv. need
166.3
Bn. $
% Profitable plants
100
%
Xinjiang
CO2 emissions saved
289.7
MT/y
Total W-S-B inv. need
135.2
Bn. $
% Profitable plants
98
%
Anhui
CO2 emissions saved
245.2
MT/y
Total W-S-B inv. need
131.6
Bn. $
% Profitable plants
100
%
Shaanxi
CO2 emissions saved
234.5
MT/y
Total W-S-B inv. need
118.6
Bn. $
% Profitable plants
100
%
Hebei
CO2 emissions saved
232.7
MT/y
Total W-S-B inv. need
123.4
Bn. $
% Profitable plants
100
%
Zhejiang
CO2 emissions saved
213.8
MT/y
Total W-S-B inv. need
125.6
Bn. $
% Profitable plants
100
%
Guizhou
CO2 emissions saved
163.7
MT/y
Total W-S-B inv. need
95.9
Bn. $
% Profitable plants
97
%
Hubei
CO2 emissions saved
154.9
MT/y
Total W-S-B inv. need
89.7
Bn. $
% Profitable plants
100
%
Liaoning
CO2 emissions saved
154.7
MT/y
Total W-S-B inv. need
71.8
Bn. $
% Profitable plants
100
%
Ningxia
CO2 emissions saved
135.3
MT/y
Total W-S-B inv. need
59.1
Bn. $
% Profitable plants
100
%
Fujian
CO2 emissions saved
131.6
MT/y
Total W-S-B inv. need
72.1
Bn. $
% Profitable plants
100
%
Hunan
CO2 emissions saved
128.3
MT/y
Total W-S-B inv. need
67.9
Bn. $
% Profitable plants
100
%
Gansu
CO2 emissions saved
124.3
MT/y
Total W-S-B inv. need
57.5
Bn. $
% Profitable plants
100
%
Jiangxi
CO2 emissions saved
119.1
MT/y
Total W-S-B inv. need
66.5
Bn. $
% Profitable plants
100
%
Guangxi
CO2 emissions saved
114.5
MT/y
Total W-S-B inv. need
56.9
Bn. $
% Profitable plants
92
%
Heilongjiang
CO2 emissions saved
97.3
MT/y
Total W-S-B inv. need
43.0
Bn. $
% Profitable plants
100
%
Jilin
CO2 emissions saved
81.1
MT/y
Total W-S-B inv. need
34.6
Bn. $
% Profitable plants
100
%
Shanghai
CO2 emissions saved
70.7
MT/y
Total W-S-B inv. need
37.9
Bn. $
% Profitable plants
86
%
Tianjin
CO2 emissions saved
56.3
MT/y
Total W-S-B inv. need
29.1
Bn. $
% Profitable plants
100
%
Yunnan
CO2 emissions saved
48.8
MT/y
Total W-S-B inv. need
28.2
Bn. $
% Profitable plants
91
%
Chongqing
CO2 emissions saved
32.5
MT/y
Total W-S-B inv. need
22.0
Bn. $
% Profitable plants
58
%
Hainan
CO2 emissions saved
14.6
MT/y
Total W-S-B inv. need
6.9
Bn. $
% Profitable plants
100
%
Qinghai
CO2 emissions saved
14.0
MT/y
Total W-S-B inv. need
6.0
Bn. $
% Profitable plants
100
%
Sichuan
CO2 emissions saved
9.3
MT/y
Total W-S-B inv. need
6.0
Bn. $
% Profitable plants
15
%
Load more
Sort by
CO2 emissions (high-low)
CO2 emissions (low-high)
Investment need (high-low)
Investment need (low-high)
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Plant
CO2 emissions
Investment need
Profitable?
Henan Shenhuo power station
CO2 emissions
2.6
MT/y
Investment need
1.4
Bn. $
Profitable?
Yes
No
Huadian Zhunger Dalu Waste Coal power station
CO2 emissions
2.6
MT/y
Investment need
1.2
Bn. $
Profitable?
Yes
No
Junzheng Wuhai power station
CO2 emissions
2.6
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Kailuan Guye power station
CO2 emissions
2.6
MT/y
Investment need
1.4
Bn. $
Profitable?
Yes
No
Liaoning Nanpiao power station
CO2 emissions
2.6
MT/y
Investment need
1.2
Bn. $
Profitable?
Yes
No
Panbei power station
CO2 emissions
2.6
MT/y
Investment need
1.9
Bn. $
Profitable?
Yes
No
Shanxi Guojin power station
CO2 emissions
2.6
MT/y
Investment need
1.4
Bn. $
Profitable?
Yes
No
Shanxi Guofeng power station
CO2 emissions
2.6
MT/y
Investment need
1.4
Bn. $
Profitable?
Yes
No
Shanxi Houma power station
CO2 emissions
2.6
MT/y
Investment need
1.5
Bn. $
Profitable?
Yes
No
WISCO Qingshan power station
CO2 emissions
2.6
MT/y
Investment need
1.4
Bn. $
Profitable?
Yes
No
Xinyuanjieneng Qingshuichuan power station
CO2 emissions
2.6
MT/y
Investment need
1.3
Bn. $
Profitable?
Yes
No
Douhe power station
CO2 emissions
2.4
MT/y
Investment need
1.3
Bn. $
Profitable?
Yes
No
Formosa Ningbo cogen power station
CO2 emissions
2.4
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Huaneng Qufu power station
CO2 emissions
2.4
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Huiliuhe power station
CO2 emissions
2.4
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Puyang Cogen power station
CO2 emissions
2.4
MT/y
Investment need
1.2
Bn. $
Profitable?
Yes
No
Shandong Xinfa Huayu power station
CO2 emissions
2.4
MT/y
Investment need
1.2
Bn. $
Profitable?
Yes
No
Shandong Xinfa Xiwang power station
CO2 emissions
2.4
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Sujiatun Jinshan power station
CO2 emissions
2.4
MT/y
Investment need
1.0
Bn. $
Profitable?
Yes
No
Tianjin Nangang Cogen power station
CO2 emissions
2.4
MT/y
Investment need
1.3
Bn. $
Profitable?
Yes
No
Wangping power station
CO2 emissions
2.4
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Hengyun-C power station
CO2 emissions
2.3
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Shanghai Jinshan-1 power station
CO2 emissions
2.3
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Aksu Xuzhou cogen power station
CO2 emissions
2.2
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Datang Shuangyashan power station
CO2 emissions
2.2
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Hailar power station
CO2 emissions
2.2
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Henan Nengxin Cogen power station
CO2 emissions
2.2
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Longhua Yanji power station
CO2 emissions
2.2
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Longhua Baicheng power station
CO2 emissions
2.2
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Manzhouli Dalaihu power station
CO2 emissions
2.2
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Nanyang Cogen power station
CO2 emissions
2.2
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Pingdingshan power station
CO2 emissions
2.2
MT/y
Investment need
1.3
Bn. $
Profitable?
Yes
No
Qilu Works power station
CO2 emissions
2.2
MT/y
Investment need
1.2
Bn. $
Profitable?
Yes
No
Wuhai Cogen power station
CO2 emissions
2.2
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Dragon Aromatics power station
CO2 emissions
2.1
MT/y
Investment need
1.0
Bn. $
Profitable?
Yes
No
Hongyang Lianyungang power station
CO2 emissions
2.1
MT/y
Investment need
1.0
Bn. $
Profitable?
Yes
No
Shandong Huayu aluminum power station
CO2 emissions
2.1
MT/y
Investment need
1.0
Bn. $
Profitable?
Yes
No
Zhaofeng Aluminum captive power station
CO2 emissions
2.1
MT/y
Investment need
1.2
Bn. $
Profitable?
Yes
No
Zhongyu Cogen power station
CO2 emissions
2.1
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Shanxi Yaoguang power station
CO2 emissions
2.0
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Tianlong Mining Fukang Smelting power station
CO2 emissions
2.0
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Xilaifeng power station
CO2 emissions
2.0
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Yaochi power station
CO2 emissions
2.0
MT/y
Investment need
1.2
Bn. $
Profitable?
Yes
No
Yellow River Delta power station
CO2 emissions
2.0
MT/y
Investment need
1.0
Bn. $
Profitable?
Yes
No
Juhua Quzhou Complex power station
CO2 emissions
1.9
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Ma anshan Steel power station
CO2 emissions
1.9
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Taiyang Mill power station
CO2 emissions
1.9
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Yulin Methanol power station
CO2 emissions
1.9
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Chenming Mill Shouguang Meilun Paper Mill captive power station
CO2 emissions
1.8
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Chongqing Longqiao power station
CO2 emissions
1.8
MT/y
Investment need
1.2
Bn. $
Profitable?
Yes
No
Jiulong Paper Mill Jiulong power station
CO2 emissions
1.8
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Zhenhai Oil power station
CO2 emissions
1.8
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
APP Zhenjiang Jindong Mill power station
CO2 emissions
1.7
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Chuanning Biotechnology captive power station
CO2 emissions
1.7
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Shandong Xingda cogen power station
CO2 emissions
1.7
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Yingcheng power station
CO2 emissions
1.7
MT/y
Investment need
1.0
Bn. $
Profitable?
Yes
No
Baise Tianyang power station
CO2 emissions
1.6
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Baise Tiandong power station
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Bayi Zaozhuang power station
CO2 emissions
1.6
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Bijie Cogen power station
CO2 emissions
1.6
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
CNPC Fushun Petrochemical power station
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Daqing Ethylene Plant power station
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Gansu Huating power station
CO2 emissions
1.6
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Hebin power station
CO2 emissions
1.6
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Huadian Wuda power station
CO2 emissions
1.6
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Huangshi power station
CO2 emissions
1.6
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Huaning Cogen power station
CO2 emissions
1.6
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Jinchuan Works power station
CO2 emissions
1.6
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Jingui Mill power station
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Jinhai Mill power station
CO2 emissions
1.6
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Jining Yangcheng power station
CO2 emissions
1.6
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Jinzhong Anping power station
CO2 emissions
1.6
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Jiulong Paper Mill Hailong power station
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Nanshan Thermal power station
CO2 emissions
1.6
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Shandong Zhongtai power station
CO2 emissions
1.6
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Shangwan Cogen power station
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Shenhua Guoneng Fukang power station
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Shouguang Jintaiyang cogen power station
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Shouguang Jvneng cogen Power Station
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Tiandong Kamshing power station
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Tianjin Petrolchemical captive power station
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Xinjiang Zhongtai Huatai power station
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Xinjiang Joinworld power station
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Yuyuan power station
CO2 emissions
1.6
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Dongguan Sanlian power station
CO2 emissions
1.5
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Fulaerji-1 power station
CO2 emissions
1.5
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Panzhihua Works power station
CO2 emissions
1.5
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Shuijiang Zutuan power station
CO2 emissions
1.5
MT/y
Investment need
1.0
Bn. $
Profitable?
Yes
No
Weihai cogen power station
CO2 emissions
1.5
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
ZhongKe Guangdong Captive power station
CO2 emissions
1.5
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Zhongneng Polysilicon power station
CO2 emissions
1.5
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Zhongtian Hechuang Ordos power station
CO2 emissions
1.5
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Shandong Yulong Petrochemical power station
CO2 emissions
1.5
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Baode power station
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Beitun Cogen power station
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Bole Cogen power station
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Changji Fukang power station
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Changzhi Tunliu power station
CO2 emissions
1.4
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Chifeng Cogen power station
CO2 emissions
1.4
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Chifeng Waste Coal power station
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Previous
Next
Load more
Location view
Get insights for a country or region
Country
Region
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Zimbabwe
Zambia
Vietnam
Uzbekistan
United States
Ukraine
United Kingdom
Türkiye
Thailand
Tajikistan
Taiwan
Sri Lanka
Spain
South Korea
South Africa
Slovenia
Slovakia
Serbia
Senegal
Russia
Romania
Panama
Poland
Philippines
Pakistan
North Macedonia
North Korea
Nigeria
New Zealand
Netherlands
Namibia
Myanmar
Morocco
Montenegro
Mexico
Mongolia
Mauritius
Malaysia
Madagascar
Kyrgyzstan
Laos
Kosovo
Kazakhstan
Japan
Italy
Israel
Ireland
Iran
Indonesia
India
Hungary
Hong Kong
Guatemala
Honduras
Guadeloupe
Greece
Germany
France
Finland
Brunei
Dominican Republic
Denmark
Colombia
Czech Republic
Croatia
China
Chile
Cambodia
Canada
Bulgaria
Brazil
Bosnia and Herzegovina
Botswana
Australia
Argentina
Bangladesh
Cannot find a country? This means it was not analyzed as part of the SwitchCoal study.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Hebei
Hatay
Haryana
Harare
Hainan
Ha Tinh
Haifa
Hai Phong
Hai Duong
Gujarat
Gyeonggi
Guizhou
Groningen
Guerrero
Guangxi
Guangdong
Guajira
Guadeloupe
Grand Casablanca
Gorontalo
Gauteng
Gorj
Georgia
Gansu
Dornod
Gangwon
Friuli-Venezia Giulia
Fukui
Fujian
Free State
Florida
FBIH
Eskişehir
Escuintla
England
East Kazakhstan
East Nusa Tenggara
East Kalimantan
East Java
Dushanbe
Doukkala-Abda
Dong Nai
Dolnośląskie
Cundinamarca
Donetsk
Dolj
Dnipropetrovsk
Dakar
Delaware
Cortés
Darkhan-Uul
Davao
Córdoba
Copperbelt
Colón
Colorado
Chūbu
Coahuila
Chūgoku
Chukotka
Chongqing
Chittagong
Chiayi
Chernihiv
Chhattisgarh
Cherkasy
Chelyabinsk
Central Visayas
Central Sulawesi
Central Kalimantan
Central Transdanubia
Central Luzon
Central Java
Ceará
Central
Central Bohemian
Cantabria
Buryatia
Calabarzon
Çanakkale
Buenos Aires
Bursa
Bulacan
Brunei-Muara
Braničevo
Bremen
Brandenburg
Boyacá
Bolu
Bishkek
Biobio Region
Berlin
Binh Thuan
Bihar
Beograd
Benue
Bashkortostan
Bengkulu
Bayern
Belikisir
Previous
Next
Cannot find a region? This means it was not analyzed as part of the SwitchCoal study.
Load more