Home
SwitchTool
About us
Insights
Resources
Global
India
252.6
GW
1149
MT
Coal plants in
India
Additional profit over 30 years
146.0
Bn. $
% Profitable
94
%
Annual CO2 emissions saved
1149
MT / year
Total W-S-B investment need
548.5
Bn. $
Investment Potential
43
n.a.
%
of this country’s annual energy-related CO2 emissions could be eliminated by SwitchCoal.
Investment breakdown
548.5
Bn. $
Initial Investment for Conversion to Wind and Solar Power Plant
146.0
Bn. $
Additional profit from switch over 30 years (Source: IEA World Energy Outlook 2022)
Solar
448,596
M. $
Wind
99,850
M. $
Battery
29,535
M. $
Production costs
4.0
ct/kWh
Mean OPEX of the coal plants within this country (Source: IEA World Energy Outlook 2022)
3.4
ct/kWh
Production cost of renewable energy
Dive deeper into the data
0
Regions
0
Power plants
Sort by
CO2 emissions saved (high-low)
CO2 emissions saved (low-high)
Total W-S-B inv. need (high-low)
Total W-S-B inv. need (low-high)
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Region
CO2 emissions saved
Total W-S-B inv. need
% Profitable plants
Uttar Pradesh
CO2 emissions saved
137.4
MT/y
Total W-S-B inv. need
71.8
Bn. $
% Profitable plants
96
%
Chhattisgarh
CO2 emissions saved
128.2
MT/y
Total W-S-B inv. need
62.9
Bn. $
% Profitable plants
100
%
Maharashtra
CO2 emissions saved
119.9
MT/y
Total W-S-B inv. need
56.9
Bn. $
% Profitable plants
100
%
Madhya Pradesh
CO2 emissions saved
96.9
MT/y
Total W-S-B inv. need
46.1
Bn. $
% Profitable plants
94
%
Odisha
CO2 emissions saved
92.4
MT/y
Total W-S-B inv. need
45.7
Bn. $
% Profitable plants
100
%
Gujarat
CO2 emissions saved
74.1
MT/y
Total W-S-B inv. need
30.6
Bn. $
% Profitable plants
76
%
West Bengal
CO2 emissions saved
73.1
MT/y
Total W-S-B inv. need
36.0
Bn. $
% Profitable plants
100
%
Tamil Nadu
CO2 emissions saved
70.4
MT/y
Total W-S-B inv. need
32.0
Bn. $
% Profitable plants
82
%
Andhra Pradesh
CO2 emissions saved
62.5
MT/y
Total W-S-B inv. need
29.8
Bn. $
% Profitable plants
100
%
Telangana
CO2 emissions saved
61.5
MT/y
Total W-S-B inv. need
28.9
Bn. $
% Profitable plants
100
%
Jharkhand
CO2 emissions saved
51.8
MT/y
Total W-S-B inv. need
24.3
Bn. $
% Profitable plants
100
%
Rajasthan
CO2 emissions saved
46.1
MT/y
Total W-S-B inv. need
19.8
Bn. $
% Profitable plants
73
%
Karnataka
CO2 emissions saved
44.1
MT/y
Total W-S-B inv. need
18.0
Bn. $
% Profitable plants
100
%
Bihar
CO2 emissions saved
36.2
MT/y
Total W-S-B inv. need
17.3
Bn. $
% Profitable plants
88
%
Punjab state
CO2 emissions saved
25.8
MT/y
Total W-S-B inv. need
13.5
Bn. $
% Profitable plants
100
%
Haryana
CO2 emissions saved
24.4
MT/y
Total W-S-B inv. need
12.7
Bn. $
% Profitable plants
100
%
Assam
CO2 emissions saved
3.6
MT/y
Total W-S-B inv. need
2.2
Bn. $
% Profitable plants
100
%
Uttarakhand
CO2 emissions saved
0.2
MT/y
Total W-S-B inv. need
0.1
Bn. $
% Profitable plants
100
%
Load more
Sort by
CO2 emissions (high-low)
CO2 emissions (low-high)
Investment need (high-low)
Investment need (low-high)
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Plant
CO2 emissions
Investment need
Profitable?
Jawaharpur Thermal Project
CO2 emissions
5.2
MT/y
Investment need
2.3
Bn. $
Profitable?
Yes
No
Udangudi Super Critical Thermal Power Project
CO2 emissions
5.2
MT/y
Investment need
2.0
Bn. $
Profitable?
Yes
No
Angul power station
CO2 emissions
5.0
MT/y
Investment need
2.3
Bn. $
Profitable?
Yes
No
Anuppur Thermal Power Project
CO2 emissions
5.0
MT/y
Investment need
2.2
Bn. $
Profitable?
Yes
No
Baradarha power station
CO2 emissions
5.0
MT/y
Investment need
2.3
Bn. $
Profitable?
Yes
No
Dhariwal power station
CO2 emissions
5.0
MT/y
Investment need
2.2
Bn. $
Profitable?
Yes
No
Guru Hargobind Lehra Mohabbat Power Station
CO2 emissions
5.0
MT/y
Investment need
2.7
Bn. $
Profitable?
Yes
No
Haldia Energy power station
CO2 emissions
5.0
MT/y
Investment need
2.3
Bn. $
Profitable?
Yes
No
Mutiara Coastal Energen Thermal Power Plant
CO2 emissions
5.0
MT/y
Investment need
2.0
Bn. $
Profitable?
Yes
No
Pegadapalli (Jaipur Mandal) power station
CO2 emissions
5.0
MT/y
Investment need
2.2
Bn. $
Profitable?
Yes
No
Kakatiya Thermal Power Project
CO2 emissions
4.8
MT/y
Investment need
2.0
Bn. $
Profitable?
Yes
No
Kalisindh Thermal Power Station
CO2 emissions
4.8
MT/y
Investment need
2.0
Bn. $
Profitable?
Yes
No
Kamalanga power station
CO2 emissions
4.8
MT/y
Investment need
2.6
Bn. $
Profitable?
Yes
No
Kolaghat Thermal Power Station
CO2 emissions
4.8
MT/y
Investment need
2.6
Bn. $
Profitable?
Yes
No
Maithon Right Bank Thermal Power Station
CO2 emissions
4.8
MT/y
Investment need
2.2
Bn. $
Profitable?
Yes
No
Nabinagar Thermal Power Project
CO2 emissions
4.8
MT/y
Investment need
2.2
Bn. $
Profitable?
Yes
No
Raghunathpur Thermal Power Station
CO2 emissions
4.8
MT/y
Investment need
2.2
Bn. $
Profitable?
Yes
No
Ropar power station
CO2 emissions
4.8
MT/y
Investment need
2.7
Bn. $
Profitable?
Yes
No
Chandrapura power station
CO2 emissions
4.7
MT/y
Investment need
2.6
Bn. $
Profitable?
Yes
No
Meenakshi Energy Thermal Power Project
CO2 emissions
4.7
MT/y
Investment need
2.0
Bn. $
Profitable?
Yes
No
Cuddalore IL&FS power station
CO2 emissions
4.6
MT/y
Investment need
2.2
Bn. $
Profitable?
Yes
No
Durgapur Steel City Andal power station
CO2 emissions
4.4
MT/y
Investment need
2.5
Bn. $
Profitable?
Yes
No
JSW Vijayanagar Toranagallu power station
CO2 emissions
4.4
MT/y
Investment need
1.7
Bn. $
Profitable?
Yes
No
Tuticorin NTPL power station
CO2 emissions
4.4
MT/y
Investment need
1.7
Bn. $
Profitable?
Yes
No
Malibrahmani power station
CO2 emissions
4.4
MT/y
Investment need
2.0
Bn. $
Profitable?
Yes
No
Koderma Thermal Power Station
CO2 emissions
4.3
MT/y
Investment need
1.9
Bn. $
Profitable?
Yes
No
Aditya Aluminium power station
CO2 emissions
4.2
MT/y
Investment need
1.9
Bn. $
Profitable?
Yes
No
Angul Steel power station
CO2 emissions
4.2
MT/y
Investment need
1.9
Bn. $
Profitable?
Yes
No
Jojobera Power Plant
CO2 emissions
4.2
MT/y
Investment need
2.0
Bn. $
Profitable?
Yes
No
Mahan Aluminium power station
CO2 emissions
4.2
MT/y
Investment need
2.0
Bn. $
Profitable?
Yes
No
New Neyveli Thermal Power Station
CO2 emissions
4.2
MT/y
Investment need
1.7
Bn. $
Profitable?
Yes
No
Vizag Thermal Power Plant
CO2 emissions
4.2
MT/y
Investment need
1.8
Bn. $
Profitable?
Yes
No
Budge Budge Generating Station
CO2 emissions
4.1
MT/y
Investment need
1.9
Bn. $
Profitable?
Yes
No
Anpara-D power station
CO2 emissions
4.0
MT/y
Investment need
2.3
Bn. $
Profitable?
Yes
No
Marwa power station
CO2 emissions
4.0
MT/y
Investment need
1.8
Bn. $
Profitable?
Yes
No
Renusagar power station
CO2 emissions
4.0
MT/y
Investment need
2.3
Bn. $
Profitable?
Yes
No
Panipat power station
CO2 emissions
3.8
MT/y
Investment need
2.0
Bn. $
Profitable?
Yes
No
Parli Thermal Power Station
CO2 emissions
3.8
MT/y
Investment need
1.9
Bn. $
Profitable?
Yes
No
Trombay power station
CO2 emissions
3.8
MT/y
Investment need
2.1
Bn. $
Profitable?
Yes
No
Barauni power station
CO2 emissions
3.6
MT/y
Investment need
2.0
Bn. $
Profitable?
Yes
No
Bongaigaon power station
CO2 emissions
3.6
MT/y
Investment need
2.2
Bn. $
Profitable?
Yes
No
Gandhinagar Thermal Power Station
CO2 emissions
3.6
MT/y
Investment need
1.7
Bn. $
Profitable?
Yes
No
Jharsuguda Ind-Barath power station
CO2 emissions
3.2
MT/y
Investment need
1.5
Bn. $
Profitable?
Yes
No
Bhilai Steel power station
CO2 emissions
3.0
MT/y
Investment need
1.3
Bn. $
Profitable?
Yes
No
Deenbandhu Chhotu Ram Thermal Power Plant
CO2 emissions
3.0
MT/y
Investment need
1.4
Bn. $
Profitable?
Yes
No
Lanco Amarkantak Thermal Power Project
CO2 emissions
3.0
MT/y
Investment need
1.6
Bn. $
Profitable?
Yes
No
Surat Lignite Power Plant
CO2 emissions
3.0
MT/y
Investment need
1.2
Bn. $
Profitable?
Yes
No
Binjkote power station
CO2 emissions
2.8
MT/y
Investment need
1.3
Bn. $
Profitable?
Yes
No
Dahanu power station
CO2 emissions
2.8
MT/y
Investment need
1.2
Bn. $
Profitable?
Yes
No
Dongamahua Captive Power Plant
CO2 emissions
2.8
MT/y
Investment need
1.3
Bn. $
Profitable?
Yes
No
EMCO Energy Warora Power Project
CO2 emissions
2.8
MT/y
Investment need
1.2
Bn. $
Profitable?
Yes
No
Raigarh TRN Power Project
CO2 emissions
2.8
MT/y
Investment need
1.3
Bn. $
Profitable?
Yes
No
Wardha Warora Power Plant
CO2 emissions
2.8
MT/y
Investment need
1.4
Bn. $
Profitable?
Yes
No
Durgapur Projects Limited power station
CO2 emissions
2.7
MT/y
Investment need
1.5
Bn. $
Profitable?
Yes
No
Mahadev Prasad Super Thermal Power Plant
CO2 emissions
2.7
MT/y
Investment need
1.3
Bn. $
Profitable?
Yes
No
Panki Thermal Power Station
CO2 emissions
2.7
MT/y
Investment need
1.3
Bn. $
Profitable?
Yes
No
Bhavnagar power station
CO2 emissions
2.6
MT/y
Investment need
1.0
Bn. $
Profitable?
Yes
No
Dr. Shyama Prasad Mukherjee Thermal Power Station
CO2 emissions
2.6
MT/y
Investment need
1.4
Bn. $
Profitable?
Yes
No
Goindwal Sahib Thermal Power Plant
CO2 emissions
2.6
MT/y
Investment need
1.3
Bn. $
Profitable?
Yes
No
Paras power station
CO2 emissions
2.6
MT/y
Investment need
1.3
Bn. $
Profitable?
Yes
No
Santaldih Thermal Power Station
CO2 emissions
2.6
MT/y
Investment need
1.4
Bn. $
Profitable?
Yes
No
Ennore Thermal Power Station
CO2 emissions
2.6
MT/y
Investment need
1.2
Bn. $
Profitable?
Yes
No
Bina Thermal Power Project
CO2 emissions
2.5
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Neyveli Thermal Power Station I
CO2 emissions
2.5
MT/y
Investment need
1.0
Bn. $
Profitable?
Yes
No
NTPC Seoni power station
CO2 emissions
2.5
MT/y
Investment need
1.0
Bn. $
Profitable?
Yes
No
Sabarmati power station
CO2 emissions
2.5
MT/y
Investment need
1.2
Bn. $
Profitable?
Yes
No
Adani Korba West power station
CO2 emissions
2.4
MT/y
Investment need
1.3
Bn. $
Profitable?
Yes
No
Sikka Thermal Power Station
CO2 emissions
2.4
MT/y
Investment need
1.0
Bn. $
Profitable?
Yes
No
Tenughat power station
CO2 emissions
2.4
MT/y
Investment need
1.3
Bn. $
Profitable?
Yes
No
Chennai power station
CO2 emissions
2.1
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
SEPC Tuticorin power station
CO2 emissions
2.1
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Bokaro Steel City Thermal Power Station
CO2 emissions
2.0
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Bokaro Thermal Power Station
CO2 emissions
2.0
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Rourkela Works-2 power station
CO2 emissions
2.0
MT/y
Investment need
1.1
Bn. $
Profitable?
Yes
No
Vizag Steel Plant power station
CO2 emissions
2.0
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Hirakud Smelter power station
CO2 emissions
1.9
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Rengali Bhushan power station
CO2 emissions
1.9
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Muzaffarpur power station
CO2 emissions
1.8
MT/y
Investment need
1.0
Bn. $
Profitable?
Yes
No
Ajmer power station
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Bandel Thermal Power Station
CO2 emissions
1.6
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Bhadreshwar power station (OPG)
CO2 emissions
1.6
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Hazira power station (Reliance)
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Meramandali power station
CO2 emissions
1.6
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Titagarh power station
CO2 emissions
1.6
MT/y
Investment need
0.9
Bn. $
Profitable?
Yes
No
Neyveli Zero power station
CO2 emissions
1.5
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Akrimota Power Project
CO2 emissions
1.4
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Barsingsar Thermal Power Project
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Bhandhakhar power station
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Choudwar power station
CO2 emissions
1.4
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Duburi Steel power station
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Giral power station
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Hazira power station (Essar)
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Hiranmaye Haldia power station
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Kasaipalli power station
CO2 emissions
1.4
MT/y
Investment need
0.8
Bn. $
Profitable?
Yes
No
Thoothukudi IBTPL power station
CO2 emissions
1.4
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Bela power station
CO2 emissions
1.3
MT/y
Investment need
0.6
Bn. $
Profitable?
Yes
No
Raigarh Jindal power station
CO2 emissions
1.3
MT/y
Investment need
0.7
Bn. $
Profitable?
Yes
No
Chanderiya Smelter power station
CO2 emissions
1.2
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Danapuram BMM power station
CO2 emissions
1.2
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
MIHAN Power Project
CO2 emissions
1.2
MT/y
Investment need
0.5
Bn. $
Profitable?
Yes
No
Previous
Next
Load more
Location view
Get insights for a country or region
Country
Region
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Zimbabwe
Zambia
Vietnam
Uzbekistan
United States
Ukraine
United Kingdom
Türkiye
Thailand
Tajikistan
Taiwan
Sri Lanka
Spain
South Korea
South Africa
Slovenia
Slovakia
Serbia
Senegal
Russia
Romania
Panama
Poland
Philippines
Pakistan
North Macedonia
North Korea
Nigeria
New Zealand
Netherlands
Namibia
Myanmar
Morocco
Montenegro
Mexico
Mongolia
Mauritius
Malaysia
Madagascar
Kyrgyzstan
Laos
Kosovo
Kazakhstan
Japan
Italy
Israel
Ireland
Iran
Indonesia
India
Hungary
Hong Kong
Guatemala
Honduras
Guadeloupe
Greece
Germany
France
Finland
Brunei
Dominican Republic
Denmark
Colombia
Czech Republic
Croatia
China
Chile
Cambodia
Canada
Bulgaria
Brazil
Bosnia and Herzegovina
Botswana
Australia
Argentina
Bangladesh
Cannot find a country? This means it was not analyzed as part of the SwitchCoal study.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Barisal
Barahona
Bangkok
Banten
Bangka-Belitung
Balochistan
Bagny
Bali
Baden-Wuerttemberg
Bac Giang
Azua
Aydin
Atacama Region
Asturias
Arkansas
Arkhangelsk
Assam
Apulia
Arizona
Arad
Andhra Pradesh
Antofagasta Region
Ankara
Amur
Andalusia
Altai Krai
Anhui
Almaty
Akmola
Alberta
Adana
Alabama
Aceh
Alaska
Previous
Cannot find a region? This means it was not analyzed as part of the SwitchCoal study.
Load more