Pavlodar
1971
2510
 MW
13.2
 MT/y

Aksu power station

Profitable?
No
 
Profitable?
Yes
 
Annual CO2 emissions saved
13.2
MT / year
Total W-S-B investment need
5.993
Bn. $

Investment breakdown

This power plant can be profitably converted to S-W-B with a $5.993 Bn total investment.
This power plant can be converted to S-W-B with a $5.993 Bn total investment.

Solar
1,740
M. $
Wind
3,941
M. $
Battery
311,994
M. $

Production costs

5.2
ct/kWh
Production cost of coal (Source: IEA World Energy Outlook 2022; adjusted)
3.58
ct/kWh
Production cost of renewable energy

Technical breakdown

Renewables installed capacity

Solar
2676
MW
Wind
3406
MW
Battery
274
MWh

Renewable energy production

Share of Solar-Wind to match current coal production
21.9
%
78.1
%
Solar
Wind

Renewables area

Total area required for Wind-Solar mix*: 121.65 km²
*On sites with a high wind fraction, wind need = total need. Solar panels are placed within the area occupied by wind infrastructure.
21.41
km²
121.65
km²
Area use solar
Area use wind

Environmental conditions

Key environmental conditions around coal plant site (10,000 km2)

These are input values for the SwitchCoal model taken from the following reliable sources:
Solar efficiency rate
1258
kwh/kwp
Mean wind speed
8
m/s

Impact

90%
of the world’s coal power plants can be profitably replaced by  wind-solar-battery plants.