Śląskie
2003
226
 MW
1.2
 MT/y

Chorzow Elcho power station

Profitable?
No
 
Profitable?
Yes
 
Annual CO2 emissions saved
1.2
MT / year
Total W-S-B investment need
0.737
Bn. $

Investment breakdown

This power plant can be profitably converted to S-W-B with a $0.737 Bn total investment.
This power plant can be converted to S-W-B with a $0.737 Bn total investment.

Solar
178
M. $
Wind
531
M. $
Battery
28,363
M. $

Production costs

13.5
ct/kWh
Production cost of coal (Source: IEA World Energy Outlook 2022; adjusted)
4.59
ct/kWh
Production cost of renewable energy

Technical breakdown

Renewables installed capacity

Solar
273
MW
Wind
334
MW
Battery
25
MWh

Renewable energy production

Share of Solar-Wind to match current coal production
21.5
%
78.5
%
Solar
Wind

Renewables area

Total area required for Wind-Solar mix*: 11.93 km²
*On sites with a high wind fraction, wind need = total need. Solar panels are placed within the area occupied by wind infrastructure.
2.19
km²
11.93
km²
Area use solar
Area use wind

Environmental conditions

Key environmental conditions around coal plant site (10,000 km2)

These are input values for the SwitchCoal model taken from the following reliable sources:
Solar efficiency rate
1099
kwh/kwp
Mean wind speed
8
m/s

Impact

90%
of the world’s coal power plants can be profitably replaced by  wind-solar-battery plants.