Stara Zagora
1977
1602
 MW
9.8
 MT/y

Maritsa Itzok-2 power station

Profitable?
No
 
Profitable?
Yes
 
Annual CO2 emissions saved
9.8
MT / year
Total W-S-B investment need
5.167
Bn. $

Investment breakdown

This power plant can be profitably converted to S-W-B with a $5.167 Bn total investment.
This power plant can be converted to S-W-B with a $5.167 Bn total investment.

Solar
1,570
M. $
Wind
3,406
M. $
Battery
191,445
M. $

Production costs

13.5
ct/kWh
Production cost of coal (Source: IEA World Energy Outlook 2022; adjusted)
4.57
ct/kWh
Production cost of renewable energy

Technical breakdown

Renewables installed capacity

Solar
2415
MW
Wind
2142
MW
Battery
168
MWh

Renewable energy production

Share of Solar-Wind to match current coal production
35.0
%
65.0
%
Solar
Wind

Renewables area

Total area required for Wind-Solar mix*: 76.5 km²
*On sites with a high wind fraction, wind need = total need. Solar panels are placed within the area occupied by wind infrastructure.
19.32
km²
76.50
km²
Area use solar
Area use wind

Environmental conditions

Key environmental conditions around coal plant site (10,000 km2)

These are input values for the SwitchCoal model taken from the following reliable sources:
Solar efficiency rate
1366
kwh/kwp
Mean wind speed
7
m/s

Impact

90%
of the world’s coal power plants can be profitably replaced by  wind-solar-battery plants.