Gujarat
2010
4620
 MW
20.4
 MT/y

Mundra Thermal Power Project (Adani)

Profitable?
No
 
Profitable?
Yes
 
Annual CO2 emissions saved
20.4
MT / year
Total W-S-B investment need
8.805
Bn. $

Investment breakdown

This power plant can be profitably converted to S-W-B with a $8.805 Bn total investment.
This power plant can be converted to S-W-B with a $8.805 Bn total investment.

Solar
6,436
M. $
Wind
1,886
M. $
Battery
482,173
M. $

Production costs

5.2
ct/kWh
Production cost of coal (Source: IEA World Energy Outlook 2022; adjusted)
3.01
ct/kWh
Production cost of renewable energy

Technical breakdown

Renewables installed capacity

Solar
9902
MW
Wind
2028
MW
Battery
423
MWh

Renewable energy production

Share of Solar-Wind to match current coal production
73.8
%
26.2
%
Solar
Wind

Renewables area

Total area required for Wind-Solar mix*: 93.7 km²
*On sites with a high wind fraction, wind need = total need. Solar panels are placed within the area occupied by wind infrastructure.
79.22
km²
72.43
km²
Area use solar
Area use wind

Environmental conditions

Key environmental conditions around coal plant site (10,000 km2)

These are input values for the SwitchCoal model taken from the following reliable sources:
Solar efficiency rate
1772
kwh/kwp
Mean wind speed
8
m/s

Impact

90%
of the world’s coal power plants can be profitably replaced by  wind-solar-battery plants. 
Get insights for a country or region